Measure the finished pile, not the field. For a rectangular stack, take the top length and width and add overhang. For round bales, take the row length and the tape path over the crown to the drip line. Cover the top. Leave the sides open so the stack can dry.
A hay tarp is a rain roof. It is not a silage wrap. The job is dry tops and moving air.

Cover the top, leave the sides open
University of Minnesota’s Morris study found that covering bales on gravel cut dry-matter loss from 10.9% to 4.8% over about eight months, a reduction of about 6 percentage points. Oklahoma State’s round-bale fact sheet puts uncovered ground storage at 5–20% dry-matter loss in the first nine months, versus 2–4% for covered bales kept off the ground.
Those gains come from keeping rain and snow off the top, not from sealing the pile. OSU is direct: plastic does not breathe. Hay stored above about 20% moisture under a sealed sheet can heat and mold. UMN’s storage target is below 20% moisture after baling at 15–20%.
The outer layer is most of the weather risk. UMN notes that the outer 4 inches of a 6-foot-diameter round bale hold about 25% of the bale’s volume. That is the band a top cover is trying to keep dry, together with a drained base so the bottom does not wick.
Rectangular stack: measure the top
- Build or mark the final stack. Measure the top length and the top width, not the ground footprint if the pile tapers.
- Add overhang on all four sides so drip falls clear of the outer bales. 1 to 3 ft is a common handling range, not a standard.
- Plan a crown: a ridge board, a row of extra bales, or a slight peak so water runs off instead of sitting in the middle.
- Choose anchors that will not tear bales apart or create trip hazards. Weight the edges rather than cinching the sheet into a drum.
Rectangular-stack formula
Tarp length = top length + 2 × end overhang
Tarp width = top width + 2 × side overhang
Do not add stack height. Height is for the crown, not for side curtains.
Worked example: a rectangular stack top measures 20 × 40 ft. With 2 ft of overhang on every side, the planning cover is 24 × 44 ft. If the only stock option is 25 × 45 or 30 × 50, pick the size you can still handle and tension. A sheet that is technically big enough but too heavy to crown will pond in the first storm.
UMN’s rectangular piles in the Morris study were stacked on their 4-foot sides with two extra bales laid over the cracks on top. That top layer is the watershed. A tarp has to cover those cracks and still drip past the outer faces.
Round bales: measure the row and the crown
- Set the bales how they will sit: a single row end-to-end, or a wider pile. UMN’s outdoor advice for uncovered round bales is end-to-end in lines at least 3 ft apart, not a pyramid. A pyramid traps moisture when there is no cover.
- Measure row length along the ends, bumper to bumper down the line.
- Measure crown path with a tape over the top of the bales, from the intended drip line on one side to the drip line on the other. That path is longer than the floor width of the row. Do not use diameter as if the bale were a box.
- Add end overhang and a little extra at the sides so water clears the equator of the outer bales without wrapping them into a sealed tube.
- Keep the stack off wet ground (gravel, pallets, tires). Ground contact can account for a large share of the loss; OSU notes that as much as 12 inches of the bottom of a bale can be lost to wicking.
Round-bale formula
Tarp length = row length + 2 × end overhang
Tarp width = crown path (drip line to drip line) + any extra you need to handle
If you stack more than one bale high, measure the finished pile. Bale count is not a size.
Worked example: six 5-foot-long round bales in one row sit about 30 ft end to end. The tape over a 5-foot-diameter bale from drip line to drip line, stopping near the widest point on each side, is on the order of 8 ft of fabric, not 5 ft. With 2 ft of overhang at each end and a little extra at the sides, you are in 34 × 10 ft planning territory, then round up to a stock sheet you can still pull over the crown. A second row beside the first changes the crown path; measure it.
OSU’s covering-area table is a cost tool (square feet of cover per bale at different stack geometries), not a substitute for a tape on your pile. Use it to think about how stacking changes cover area, then measure.
Which measurement to use
| Rectangular stack | Round-bale row | |
|---|---|---|
| What you measure | Top length and top width of the finished stack | Row length, plus tape over the crown to the drip line |
| What you do not measure | Stack height as if you were wrapping a box | Bale diameter as a box width; bale count alone |
| Cover math | Top + overhang on four sides | Row length + overhang; crown path for width |
| Airflow | Top sheet, sides open, slight crown | Top sheet, sides open; do not seal the equator |
| Why it matters | Rectangular bales absorb more moisture uncovered (UMN) | The outer few inches are a large share of the bale (UMN, OSU) |
Feed the rectangular numbers into the size calculator’s Hay Stack mode. For a round row, enter the crown path as the width rather than the floor width, or the sheet will come up short over the curve.
Field tips
- Create a crown so water runs off.
- Weight edges; do not cinch the cover tight (OSU).
- Retension after the first rain and wind.
- Inspect chafe where rope crosses bale edges.
- Keep bales off the ground. Covering the top does not fix a wet base.
- Do not assume a tarp makes wet hay safe to store.
Storage and covering: University of Minnesota Extension, “Preserving the value of dry stored hay” (15–20% baling moisture; covering on gravel 4.8% vs 10.9% DM loss; outer 4 in of a 6 ft round bale ≈ 25% of volume; uncovered pyramids trap moisture). Round-bale covers and sealed plastic: Oklahoma State University Extension, “Round Bale Hay Storage” (covered vs exposed loss ranges; plastic does not breathe; do not tie a cover down tight).
Frequently asked questions
Should hay be fully wrapped in a tarp?
Usually no for dry hay you want to keep dry. Cover the top to shed rain and leave sides open for airflow. Oklahoma State notes that plastic does not breathe; sealing hay above about 20% moisture under plastic can cause heating and mold. University of Minnesota recommends baling at 15–20% moisture and storing below 20%.
How much overhang does a hay tarp need?
Enough to carry water past the outer bales without turning into full side curtains. Many stacks work with 1 to 3 ft of overhang, depending on stack height and wind. That is a handling choice, not a published standard.
Can billboard vinyl be used as a hay tarp?
Some farms reuse billboard vinyl as a heavy, low-cost top cover. It can work, but check grommet placement, weight, and whether the sheet can be handled safely when wet. It still needs a crown and open sides.
What size tarp covers a standard round-bale stack?
It depends on how many bales wide and long the finished pile is, and on the path over the crown. Measure the pile. Do not buy from bale count alone. A single-row cover is a crown-path problem; a rectangular stack is a flat-top problem.
How do I stop a hay tarp from blowing off?
Use a ridge or slight slope, weight the edges, and add intermediate tie points. Oklahoma State says to weight a cover along the edges and ends so it can move a little, and not to tie it down tight, because a rigid tie tears in wind.
How this guide was prepared
We separate geometry and unit conversions from product claims, use exact standards where available, and flag specifications that vary by manufacturer. See our editorial policy for the review process.